The process we have designed for removal and reinstallation is fast and easy. It takes less then a day in or out and reduces labor costs by saving man-hours and maintaining low overhead.
These units can be designed to relocate to other areas in, or outside the stadium, or can be used in 2 locations of the stadium, or even be removed from the stadium for storing.
The system is removed by picking up a modular unit, placing it on a trailer and moving it to a desirable area. In this case the units are moved to a far parking lot for storage. The units are designed with relatively lightweight materials.
|